Results-Based Accountability

Indicator/KPI Glossary

Understand what each measure means, how it is calculated, and where it fits in RBA.

A Shared Language for Program Results

An indicator or key performance indicator (KPI) helps track a program's work, service quality, or participant outcomes. This glossary explains all 174 candidate measures across the four use cases, including measures not selected for the current prototype views.

Definitions, calculation methods, owners, and reporting cadences come from the draft KPI catalogs and still need program-team validation. A share is expressed as a percentage when multiplied by 100. The glossary does not approve targets, confirm source readiness, or turn synthetic examples into observed performance.

What Do the Glossary Labels Mean?

For framework concepts and interpretation terms, browse the RBA Glossary.

174 of 174 Indicators Shown

BayREN EASE Home

24 Indicators in the Draft Catalog

How Much Did We Do?

BE-HM-01In Prototype Views

Applications Submitted

Distinct EASE Home applications submitted in the reporting period

BE-HM-02In Prototype Views

Home Assessments Completed

Distinct home assessment events completed in the reporting period

BE-HM-03In Prototype Views

Households Receiving Completed Upgrades

Distinct households with an approved EASE Home project completed during the reporting period

BE-HM-04In Prototype Views

Upgrade Projects Completed

Distinct EASE Home projects with verified installation completion in period

BE-HM-05In Prototype Views

Incentive Dollars Paid

Net EASE Home incentive payments posted during the reporting period in USD

BE-HM-06In Prototype Views

Approved Measures Installed

Installed measures under EASE Home by approved measure type and unit

How Well Did We Do It?

BE-HW-01In Prototype Views

Application-to-Installation Time

Median calendar days from complete application to installation completion among projects completed in period

BE-HW-02In Prototype Views

Completion Quality-Check Pass Rate

Share of completed projects requiring a check that pass the approved completion-quality standard

BE-HW-03In Prototype Views

Installation Completion Within Follow-Up Window

Share of projects authorized in a fixed cohort with installation completed within an approved window

BE-HW-04In Prototype Views

Pending-Project Age

Median days waiting among authorized projects not completed or withdrawn at reporting date

BE-HW-05In Prototype Views

Customer Satisfaction

Share of valid post-service respondents rating service positively on an approved instrument

BE-HW-06In Prototype Views

Household Share of Covered Project Cost

Aggregate household contribution for program-covered work relative to covered cost among financially reconciled completed projects

BE-HW-07In Prototype Views

Comparable Utility Follow-Up Coverage

Share of completed households due for energy follow-up with valid comparable pre and post utility cost and usage data

BE-HW-08In Prototype Views

Paired Household Survey Coverage

Share of completed households due for survey follow-up with valid linked baseline and follow-up responses

BE-HW-09In Prototype Views

Application Completion Rate

Share of application starts in a fixed cohort becoming complete submissions within an approved window

BE-HW-10In Prototype Views

Versioned Eligibility Determination Completeness

Share of final eligibility determinations with approved rule version date status and verification pathway recorded

Is Anyone Better Off?

BE-BO-01In Prototype Views

Improved Household Comfort

Share of valid paired household respondents with improved comfort on an approved comparable scale

BE-BO-02In Prototype Views

Paired Household Energy-Burden Change

Mean post-minus-pre change in annual household energy cost as share of matching gross annual household income in percentage points

BE-BO-03In Prototype Views

Observed Annual Energy-Bill Change

Mean observed post-minus-pre household energy cost for comparable annual periods in USD per household-year

BE-BO-04In Prototype Views

Normalized Annual Electricity-Use Change

Mean modeled normalized post-minus-pre electricity use in kWh per household-year using common approved conditions

BE-BO-05In Prototype Views

Normalized Annual Gas-Use Change

Mean modeled normalized post-minus-pre gas use in therms per household-year using common approved conditions

BE-BO-06In Prototype Views

Modeled Operational Emissions Change

Mean modeled annual operational energy emissions post-minus-pre in kg CO2e per household-year for households with complete included fuels

BE-BO-07In Prototype Views

Reduced Reported Energy-Payment Hardship

Share of paired household respondents reporting less difficulty paying home energy bills on a comparable instrument

BE-BO-08In Prototype Views

Gap in Household Burden Change

Difference in mean BE-BO-02 change between an approved priority group and reference group in percentage points

Clipper START

50 Indicators in the Draft Catalog

How Much Did We Do?

CS-HM-01In Prototype Views

Applications Received

Distinct submitted applications in period

CS-HM-02In Prototype Views

Eligibility Decisions Completed

Applications receiving final eligibility determination

CS-HM-03In Prototype Views

Applicants Approved

Applicants determined eligible in period

CS-HM-04In Prototype Views

New Enrollments

Eligible applicants completing program enrollment

CS-HM-05In Prototype Views

Active Participants

Unique enrolled participants meeting approved active definition

CS-HM-06In Prototype Views

Discounted Trips

Qualifying transit trips receiving program discount

CS-HM-07Catalog Only

Discount Value

Total fare discount attributable to program

CS-HM-08Catalog Only

Participating Operators

Transit operators accepting the discount

CS-HM-09In Prototype Views

Renewals Completed

Participants completing required renewal

CS-HM-10In Prototype Views

Outreach Events

Program outreach events delivered

CS-HM-11In Prototype Views

Assisted Enrollments

Applicants receiving documented enrollment assistance

CS-HM-12Catalog Only

Community Partners

Active community organizations supporting enrollment

CS-HM-13Catalog Only

Language Support Interactions

Program interactions delivered in a requested language

CS-HM-14Catalog Only

Accessibility Accommodations Delivered

Documented accommodations provided during application or support

CS-HM-15Catalog Only

Application Channel Mix

Applications submitted through each approved channel

How Well Did We Do It?

CS-HW-01In Prototype Views

Average Processing Time

Elapsed time from complete application to decision

CS-HW-02In Prototype Views

On-Time Determinations

Share of complete applications decided within approved service standard

CS-HW-03In Prototype Views

Application Completion Rate

Share of started applications submitted complete

CS-HW-04Catalog Only

Approval Rate

Share of completed eligibility decisions approved

CS-HW-05Catalog Only

Applications with Documented Reason

Share of denied applications with a standardized reason

CS-HW-06In Prototype Views

Application Abandonment Rate

Share of started applications not submitted within defined window

CS-HW-07In Prototype Views

Renewal Completion Rate

Share of participants due for renewal completing on time

CS-HW-08Catalog Only

Enrollment-to-First-Use Rate

Share of enrolled participants with a qualifying first use

CS-HW-09Catalog Only

Customer Satisfaction

Share of respondents rating service positively

CS-HW-10In Prototype Views

Customer Service Response Time

Median time from inquiry receipt to first response

CS-HW-11In Prototype Views

Complaint Resolution Rate

Share of complaints resolved within approved standard

CS-HW-12In Prototype Views

Fare Transaction Reconciliation

Share of submitted operator transaction records successfully reconciled

CS-HW-13In Prototype Views

Enrollment System Availability

Share of scheduled service time enrollment channel is available

CS-HW-14Catalog Only

Customer-Reported Enrollment Ease

Share of surveyed participants reporting enrollment was easy

CS-HW-15Catalog Only

Partner Referral Conversion

Share of referred eligible residents completing enrollment

Is Anyone Better Off?

CS-BO-01Catalog Only

Monthly Participant Savings

Average monthly fare savings reported by participants

CS-BO-02In Prototype Views

Improved Affordability

Share of participants reporting transit is more affordable

CS-BO-03Catalog Only

Transit Use Increase

Share of participants reporting increased transit use after enrollment

CS-BO-04In Prototype Views

Change in Monthly Transit Trips

Mean change in qualifying monthly trips for linked participants

CS-BO-05In Prototype Views

Improved Job Access

Share reporting improved access to employment

CS-BO-06In Prototype Views

Improved Healthcare Access

Share reporting improved ability to reach healthcare

CS-BO-07In Prototype Views

Improved Education Access

Share reporting improved ability to reach education or training

CS-BO-08Catalog Only

Improved Essential-Service Access

Share reporting improved access to essential services

CS-BO-09Catalog Only

Transit Confidence

Share reporting increased confidence using transit

CS-BO-10Catalog Only

Reduced Transportation Cost Burden

Share reporting lower transportation cost burden

CS-BO-11Catalog Only

Fewer Missed Essential Trips

Share reporting fewer missed work or essential trips due to cost

CS-BO-12In Prototype Views

One-Year Retention

Share of enrolled cohort still participating after one year

CS-BO-13Catalog Only

Participant-Reported Financial Stress

Share reporting reduced transportation-related financial stress

CS-BO-14Catalog Only

Participant-Reported Mobility Options

Share reporting more practical transportation options

CS-BO-15Catalog Only

Improved Frequent-Transit Access

Share of enrolled population with improved access to frequent transit

CS-BO-16Catalog Only

Use Across Participating Operators

Share of active users with qualifying use on multiple operators

CS-BO-17Catalog Only

Reduced Unmet Transportation Need

Share reporting fewer unmet transportation needs

CS-BO-18In Prototype Views

Outcome Gap in Affordability

Absolute difference in improved-affordability rates between priority and comparison groups

CS-BO-19In Prototype Views

Outcome Gap in Transit Use

Absolute difference in transit-use change between priority and comparison groups

CS-BO-20Catalog Only

Participant-Reported Overall Wellbeing

Share reporting improved ability to participate in daily life

One Bay Area Grant (OBAG)

50 Indicators in the Draft Catalog

How Much Did We Do?

OB-HM-01In Prototype Views

Grants Awarded

Distinct grants with approved award in period

OB-HM-02In Prototype Views

Total Grant Dollars Awarded

Approved grant amount for awards in period

OB-HM-03Catalog Only

Funds Allocated

Funding assigned to jurisdictions or program categories

OB-HM-04In Prototype Views

Funds Obligated

Funds with approved obligation status

OB-HM-05In Prototype Views

Funds Expended

Reported or verified expenditures during period

OB-HM-06In Prototype Views

Projects Funded

Distinct projects receiving OBAG award

OB-HM-07Catalog Only

Jurisdictions Receiving Allocation

Distinct jurisdictions with approved allocation

OB-HM-08In Prototype Views

Investment in EPCs

Awarded dollars assigned to projects located in or serving EPCs

OB-HM-09Catalog Only

Affordable Housing-Related Projects Funded

Projects with approved affordable housing activity classification

OB-HM-10In Prototype Views

Technical Assistance Engagements

Recipients receiving documented technical assistance

OB-HM-11In Prototype Views

Projects with Equity Benefit Plans

Funded projects with approved beneficiary/equity plan

OB-HM-12In Prototype Views

Projects with Complete Milestone Reports

Projects with required current milestone submission

OB-HM-13In Prototype Views

Projects Completed

Projects reaching approved completion and closeout status

OB-HM-14Catalog Only

Community Engagement Activities

Funded projects with documented community engagement activities

OB-HM-15Catalog Only

Projects with Post-Completion Evaluation

Completed projects with outcome evaluation record

How Well Did We Do It?

OB-HW-01In Prototype Views

Allocation-to-Award Processing Time

Elapsed days from complete application or allocation decision to award

OB-HW-02In Prototype Views

Funds Obligated on Schedule

Share of planned funds obligated by approved schedule milestone

OB-HW-03In Prototype Views

Projects Delivered on Time

Share of completed projects meeting approved schedule

OB-HW-04In Prototype Views

Projects Delivered Within Budget

Share of completed projects within approved budget tolerance

OB-HW-05Catalog Only

Grant Processing Time

Elapsed days from complete submission to award decision

OB-HW-06In Prototype Views

Recipient Reporting Compliance

Share of required reports submitted complete and on time

OB-HW-07Catalog Only

Grant Compliance Rate

Share of reviewed projects meeting applicable requirements

OB-HW-08Catalog Only

Recipient Satisfaction

Share of recipient survey respondents rating administration positively

OB-HW-09In Prototype Views

Project Schedule Variance

Average percentage difference between actual and approved milestone date

OB-HW-10In Prototype Views

Project Cost Variance

Average percentage difference between final and approved project cost

OB-HW-11In Prototype Views

Project Readiness Rate

Share of submitted projects meeting approved readiness criteria

OB-HW-12In Prototype Views

Technical Assistance Usefulness

Share of recipients reporting assistance improved readiness or delivery

OB-HW-13In Prototype Views

Equity Plan Quality

Share of reviewed equity plans meeting approved quality standard

OB-HW-14Catalog Only

Community Feedback Response Rate

Share of material community comments with documented response or disposition

OB-HW-15In Prototype Views

Portfolio Data Completeness

Share of required project fields passing completeness validation

Is Anyone Better Off?

OB-BO-01In Prototype Views

Improved Access to Jobs

Share of completed projects with measured improvement in job accessibility

OB-BO-02In Prototype Views

Residents Gaining Frequent Transit Access

Estimated residents newly within approved frequent-transit access threshold

OB-BO-03Catalog Only

Reduced Travel Time

Change in travel time for defined project trips or populations

OB-BO-04In Prototype Views

Improved Walking Access

Share of project-area population gaining safe walking access to destinations

OB-BO-05In Prototype Views

Improved Biking Access

Share of project-area population gaining low-stress bicycle access

OB-BO-06In Prototype Views

Reduced Serious Traffic Injuries

Change in serious/fatal injuries in project influence area

OB-BO-07In Prototype Views

Housing Units Enabled

Affordable or total housing units documented as enabled by funded project

OB-BO-08In Prototype Views

Affordable Housing Near Transit

Affordable units completed near frequent transit associated with funded activity

OB-BO-09Catalog Only

Improved Transit Service Access

Change in population served by improved transit infrastructure or service

OB-BO-10Catalog Only

Improved Transportation Reliability

Change in on-time or reliable service for project-supported routes

OB-BO-11Catalog Only

Improved Active Transportation Use

Change in walking/biking counts or mode share in project area

OB-BO-12Catalog Only

Reduced Transportation Cost Burden

Change in transport cost burden for defined population

OB-BO-13Catalog Only

Climate Emissions Benefit

Estimated change in greenhouse gas emissions attributable to completed project

OB-BO-14Catalog Only

Climate Resilience Improvement

Share of completed projects with verified reduction in climate vulnerability exposure

OB-BO-15Catalog Only

Community Safety Perception Improvement

Share of residents reporting improved safety near completed projects

OB-BO-16Catalog Only

Improved Access to Essential Services

Change in residents able to reach selected essential destinations

OB-BO-17In Prototype Views

Project Benefit Realized

Share of completed projects with verified intended benefit

OB-BO-18In Prototype Views

Investment Benefit Share in EPCs

Share of measured project benefits accruing in EPC geography

OB-BO-19In Prototype Views

Reduced Access Disparity

Change in gap in accessibility between priority and comparison communities

OB-BO-20Catalog Only

Community-Reported Project Benefit

Share of surveyed affected residents reporting useful project benefit

Bay Area Bike Share Equity

50 Indicators in the Draft Catalog

How Much Did We Do?

BS-HM-01Catalog Only

Applications or Sign-Ups

Distinct applications or sign-up events for equity membership

BS-HM-02In Prototype Views

Equity Memberships Issued

New discounted or equity memberships activated

BS-HM-03Catalog Only

Active Equity Members

Equity members meeting approved active definition at period end

BS-HM-04In Prototype Views

Discounted Trips

Trips attributed to equity membership

BS-HM-05In Prototype Views

Bikes Deployed in EPCs

Bikes available for customer use within EPC service areas

BS-HM-06In Prototype Views

Stations in EPCs

Active bike-share stations located within EPC geography

BS-HM-07In Prototype Views

Community Outreach Events

Completed outreach events targeted to priority communities

BS-HM-08In Prototype Views

Outreach Participants

Unique or estimated attendees reached through outreach

BS-HM-09Catalog Only

Community Partnerships Active

Partners with verified bike-share equity activity

BS-HM-10In Prototype Views

Enrollment Assistance Interactions

Documented one-to-one or group enrollment assistance

BS-HM-11Catalog Only

Cash or Non-Bank Payments

Equity memberships purchased through approved non-bank payment route

BS-HM-12Catalog Only

Accessible Enrollment Support

Enrollment support events provided in accessible formats

BS-HM-13Catalog Only

Transit-Connected Stations

Active stations within approved walking distance of transit stops

BS-HM-14In Prototype Views

Equity Program Investment

Funds spent on approved equity membership and access activities

BS-HM-15Catalog Only

Outreach Language Coverage

Languages in which outreach or enrollment support was offered

How Well Did We Do It?

BS-HW-01In Prototype Views

Enrollment Completion Rate

Share of started equity membership applications completed

BS-HW-02In Prototype Views

Enrollment Processing Time

Elapsed time from complete application to membership activation

BS-HW-03In Prototype Views

Membership Renewal Rate

Share of eligible equity members renewing by the deadline

BS-HW-04Catalog Only

Trip Utilization Rate

Share of active equity memberships with one or more qualifying trips

BS-HW-05Catalog Only

Member Satisfaction

Share of responding members rating service positively

BS-HW-06Catalog Only

Perceived Enrollment Ease

Share of respondents reporting enrollment was easy

BS-HW-07Catalog Only

Customer Complaint Resolution

Share of complaints resolved within approved service standard

BS-HW-08In Prototype Views

Bike Availability Rate

Share of monitored service hours with minimum usable bike availability

BS-HW-09In Prototype Views

Station Availability Rate

Share of monitored service hours stations are operational

BS-HW-10In Prototype Views

Trip Completion Success

Share of initiated trips completed without service failure

BS-HW-11In Prototype Views

Payment Failure Rate

Share of membership payment attempts rejected or failed

BS-HW-12In Prototype Views

Outreach-to-Enrollment Conversion

Share of consented outreach referrals enrolling within defined window

BS-HW-13In Prototype Views

Customer Support Response Time

Median time from support request to first response

BS-HW-14Catalog Only

Accessible Fleet/Service Coverage

Share of service locations meeting approved accessibility criteria

BS-HW-15Catalog Only

Outreach Feedback Completion

Share of outreach events with documented feedback and follow-up

Is Anyone Better Off?

BS-BO-01In Prototype Views

Increased Transportation Options

Share reporting bike share added a useful transportation option

BS-BO-02In Prototype Views

Increased Bike-Share Trip Frequency

Mean change in monthly trips per equity member

BS-BO-03Catalog Only

Improved Job Access

Share reporting improved access to jobs through bike share

BS-BO-04Catalog Only

Improved Education Access

Share reporting improved access to education or training

BS-BO-05Catalog Only

Improved Healthcare Access

Share reporting improved ability to reach healthcare

BS-BO-06Catalog Only

Improved Transit Connection

Share of members using bike share to connect to transit

BS-BO-07In Prototype Views

Transportation Cost Savings

Average reported transport cost savings among equity members

BS-BO-08Catalog Only

Reduced Transportation Barriers

Share reporting fewer barriers to local travel

BS-BO-09In Prototype Views

Improved Local Mobility Access

Share of residents in service area with useful bike-share access

BS-BO-10In Prototype Views

Reduced Access Disparity

Gap in practical access rate between priority and comparison areas

BS-BO-11In Prototype Views

Improved Safety Perception

Share reporting cycling feels safer for intended trips

BS-BO-12Catalog Only

Reduced Exposure to Unsafe Routes

Share of member trips on routes meeting approved low-stress standard

BS-BO-13Catalog Only

Sustained Equity Membership

Share of new equity members active at 12 months

BS-BO-14Catalog Only

Reduced Difference in Utilization

Trip utilization gap between equity and comparison memberships

BS-BO-15Catalog Only

Improved Access to Essential Destinations

Share of service-area residents with destinations reachable by bike share

BS-BO-16Catalog Only

Reduced Unmet Mobility Need

Share reporting fewer trips forgone due to mobility barriers

BS-BO-17Catalog Only

Improved Community Mobility Choice

Share of community respondents reporting more useful travel choices

BS-BO-18Catalog Only

Active Transportation Increase

Share of participants reporting increased active transportation

BS-BO-19In Prototype Views

Outcome Gap in Affordability

Gap in reported affordability improvement between groups

BS-BO-20Catalog Only

Community-Reported Overall Mobility Improvement

Share reporting improved ability to participate in daily activities